How it works

Clean-energy chargers, engineered into your existing site.

A flexible licence model that takes the capital, complexity and operational risk off the site host.

AC fast EV chargers powered by clean energy

A typical KNC site: 4–20 AC fast chargers backed by clean energy from the grid — no panels or batteries installed on your roof.

  1. 01
    Layer

    Clean energy supply

    We source clean energy for every site through accredited GreenPower from the grid. No panels or batteries installed on your building.

  2. 02
    Layer

    Smart load management

    Our controller balances chargers against the building's existing supply in real time — no expensive switchboard or grid upgrade required.

  3. 03
    Layer

    AC fast chargers

    7–22 kW chargers in staff, visitor or shared bays, payment-enabled and remotely monitored 24/7.

The licence

Infrastructure economics, site-host friendly.

KNC Energy owns the hardware. The site host grants us a licence over the relevant car spaces and electrical room. We carry all capital, operating and warranty risk.

Site host pays
$0
Term
Flexible agreement terms
Energy supply
Clean energy via accredited GreenPower
Insurance, maintenance, monitoring
KNC Energy
End of term
Renew, hand back, or buy out
Grid upgrade required
Typically none
The process

From first walkthrough to switched on in about 90 days.

  1. Step 1
    Site assessment

    We walk the site, review your switchboard, meter and parking layout. Free, no obligation.

  2. Step 2
    Design proposal

    Within 3 weeks we deliver a layout, charger count and clean-energy supply plan.

  3. Step 3
    Licence & approvals

    We sign a licence agreement with the site owner or facility manager, then handle DA and DNSP paperwork.

  4. Step 4
    Install

    Typical installation is 2–4 weeks on site with minimal disruption to staff, patients or operations.

  5. Step 5
    Operate

    We monitor, maintain and operate the chargers for the full agreement term.